Netris Presents at Networking Field Day 40
April 8 - 10, 2026
Part 1 —
Introduction & Overview
Part 2 —
Lifecycle of AI Networking
How to be ready before the hardware arrives.
Alex walks through the Netris deployment lifecycle, from topology modeling and simulation with NVIDIA DSX Air to Zero Touch Provisioning and automated validation. He also shows how Netris supports ongoing Day 2 network operations.
Part 3 —
Consuming AI Networks
Building a GPU cloud that operators can actually consume.
See how Netris abstracts complex AI networking into cloud-provider-grade constructs that operators and tenants can easily consume. Alex also covers granular multi-tenancy with NVIDIA BlueField DPUs and Netris SoftGate.
Part 4 —
Day Zero Demo
From an empty controller to a provisioned, internet-connected GPU cluster — live.
Watch the full Day Zero workflow, from topology modeling and simulation to isolated tenant VPCs and internet connectivity. Alex then demonstrates NVIDIA BlueField DPU integration and bare-metal-to-VM connectivity in a physical lab.